Prime power generators for AI data centers

10 vendors sell units of 10 MW or more for behind-the-meter data center power, led by Doosan (380 MW), Siemens Energy (66 MW) and GE Vernova (57 MW). 6 build gas turbines, 4 build medium-speed gas engines, and 2 publish a hydrogen rating.

Counts come from the sourced dataset; the methodology sets the rating rules.

10 of 37 vendorsChecked

Prime moverFuelsHydrogenCapacity and lead-time news
Doosan Enerbility380,0001380,0001Gas turbineNatural gas / LNG—Mar 2026: seven additional 380 MW turbine/generator units ordered for a U.S. data center; deliveries scheduled monthly from May 2029.2026-11-11
Siemens Energy4,000166,0001Gas turbine———2026-11-11
GE Vernova37,000157,0002Gas turbineNatural gas; Hydrogen blends; Diesel; LPG; BiodieselLM2500XPRESS up to 75% H2; TM2500 75%; LM6000 100% H2 capable—2026-11-11
PROENERGY50,000150,0001Gas turbineNatural gas—Apr 2026: 650 MW order of 13 PE6000 units for Crusoe AI factories2026-11-11
Solar Turbines1,210138,0001Gas turbineNatural gas; Diesel (dual fuel); HVO (configurable on many packages); Biogas——2026-11-11
APR Energy20,000135,0001Gas turbineNatural gas; LNG; LPG; hydrogen options (configuration-dependent)—Jan 2026: eight additional turbines expanded owned fleet capacity from 850 MW to over 1.1 GW (fleet total, not a per-unit rating).2026-11-11
Wärtsilä Energy10,400122,9001Reciprocating engineNatural gas; Dual fuel (gas and liquid); Liquid fuel—Oct 2026: 282 MW U.S. data-center order for 15 × 50SG engines, with equipment delivery in 2028 and operation expected in 2029. The 50SG order is separate from the named rating envelope.2026-11-11
HD Hyundai Heavy Industries (HiMSEN)1,100121,8001Reciprocating engineNatural gas; Dual fuel (natural gas/diesel/HFO); Liquid fuel (model-dependent)——2026-11-11
Bergen Engines7,050111,7701Reciprocating engineNatural gas——2026-11-11
INNIO Jenbacher—10,6061Reciprocating engineNatural gas; Biogas; Hydrogen; LNGType 4 engines run on 100% H2 today; “Ready for H2” units can be converted to up to 100% hydrogen; 100% hydrogen data center backup demonstrated at 3 MW scaleOct 2026: 620 MW follow-on order brings one data center customer to about 1.72 GW of containerized J624 engines; a separate 450 MW order (Sep 2026) delivers by 20282026-11-11

The lines behind each row

All 37 vendors

How to read the columns

Methodology
Smallest unit kW
Lowest published electrical output of one generating unit in the named Lines, in kWe. Portfolio minima may include portable models. Standby where available; kVA-only figures assume 0.8 power factor. Consult Rating basis and scope; blank when unverified.
Largest unit kW
Highest published electrical output of one generating unit in the named Lines, in kWe. Standby where available; other duty and frequency bases are disclosed in Rating basis and scope. kVA-only figures assume 0.8 power factor. Mechanical output and multi-unit totals are excluded.
Prime mover
What turns the alternator in the named lines: a reciprocating (piston) engine, a gas turbine, or both.
Fuels
Fuels the vendor lists for the named lines: diesel, HVO (hydrotreated vegetable oil, EN 15940), natural gas, biogas, propane, hydrogen blends.
Hydrogen
Hydrogen capability exactly as the vendor states it: blend share by volume, '100% hydrogen' or 'hydrogen-ready' with its conditions. Blank when the vendor states none.
Capacity and lead-time news
The latest dated, sourced statement on factory capacity, expansion investment or lead time for these lines, from the vendor, a filing or trade press. Month and year first.